
I am nearing completion of the project now, my windscreen arrived today.
I am in the final throws of fitting the glow plug relay, I have the cooling system to connect and a leak on #3 injector pipe to repair.
I then thought, I have no pad locks!
So, instead of buying 3, I will buy 4.
I am then going to weld 2 tabs next to the handbrake lever, both with holes in.
Once the hand brake is applied, it will uncover the holes in the tabs to allow me to fit the pad lock, this will lock the handbrake lever in the up position.
Oh, I also have to fix the annoying problem of the horn sounding when I use main beam on the headlamps!